Land Conformity Evaluation Site
The correct site selected that conforms to the requirements of a certain project is a fundamental pre-requisite. Thereby the saying “the right plant on the right land/location” is definitely a positive beginning. A site selection for a plantation needs not only land fertility conducive to the plant or crop but also weather and climatic conditions to be favourable. Elevation, flood-free, road system accessible to ports, industrial and commercial areas. Man power/labour force, government projection, regulations and by-laws, tax structure, etc.
Evaluation of this site selection to conform to needs should be :
1. Research in the manner to inspect examine and investigate the potential natural resources of the proposed site/location for a plantation development.
2. To evaluate, analyze and decide given land area waits and their conformities on the projected plantation.
3. To recommend and advise on land area pattern, land use and other related subjects deemed necessary.